Continuing a long lasting tradition of docking & ship-repairs in Constanta, our Client, MINERVA Marine Greece, awarded to us the retrofitting of one of their SUEZMAX ship, having the below main scope of works:


General docking & repair works


Normal docking works

Treatment works:


  • External hull
  • Pipe works: up to 350 rm
  • Mecanical and electrical works: M/E o/h: Piston o/h (6 lines), Fuel injections pumps (6 pcs); Stuffing box o/h (6 pcs); Bearings: main (3 pcs), crosshead (1 pc), crankpin (1 pc); Air cooler o/h (1 pc); Fans o/h (8 pcs); PV valves o/h (14 pcs); Pumps o/h (8 pcs); Auxiliary boilers cleaning (2 pcs).

  • Ballast water treatment system (ECOCHLOR ECO 498)


    Soft steel works

    Equipment: Installation of equipment in Engine Room, pump room and on deck;

    Pipe works: manufacture and install: steel galv. pipes- up to 325 rm / stainless steel pipes- up to 210 rm/ O/S s.s. pipes- up to 25 m/ Copper pipes-up to 130 rm/ Assistance for O/S GRE pipe installation already manufactured (255 rm).

    Electrical works: Install & connect O/S electrical cables- 1,183 rm





     

    General

    Type Tanker
    Status finished
    LOA 276.88
    B 50.04
    DWT 159,438
    Customer center
    > News and events
    On 12th of November 2024, after completion of her commercial obligations and having finalized the ...
    22.11.2024
    In line with the company’s motto, SANTIERUL NAVAL CONSTANTA SA (CONSTANTA SHIPYARD), in close ...
    14.11.2024
    We are proud to announce that on Thursday, October 3, 2024, the naming ceremony of the ship M/T ...
    04.10.2024