Projects
> 2011-MT CE-MERAPI

During June and July we have performed dry dock repairs to M/T “CE-MERAPI”, main works being mentioned below:

- Normal docking works: anchors and chains, valves overhauling, anodes and sea chests renewal, tail shaft and rudder measurements, tail shaft sealing system overhauling

- Hull treatment: High Pressure Fresh Water Jet washing: 18,624 m², grit blasting e SA1/SA2 ~2000 m² from external hull surface, painting and treatment in 4 ballast tanks, starboard and portside;

- Steel and soft steel works: renewal of approx. 4.5 tons of steel, in ballast tanks and external hull, including soft steel works in various locations;

- Piping works: minor repairs to ballast installation, fire fighting and compressed air systems, Engine Room and main deck;

- Mechanical and Electrical works: boiler valves, pumps overhauling (one cargo pump and two ballast pumps), Main Engine scavenging cooler, PV valves overhauling, life saving installation repairs, fans and electrical engines overhauling.

 

General

Type Crude / Oil Products Tanker
Status finished
LOA 240.99
B 42
DWT 105,274
Customer center
> News and events
On 12th of November 2024, after completion of her commercial obligations and having finalized the ...
22.11.2024
In line with the company’s motto, SANTIERUL NAVAL CONSTANTA SA (CONSTANTA SHIPYARD), in close ...
14.11.2024
We are proud to announce that on Thursday, October 3, 2024, the naming ceremony of the ship M/T ...
04.10.2024