Santierul Naval Constanta S.A.
Projects
> 2011-MT CAP DIAMANT

M/T CAP DIAMANT underwent repairs and dry-dock, between 26.08.2011 – 13.09.2011, in Constanta Shipyard, during which, the following main works were carried out:

 

  • Dry-dock Works: sea chests cleaning, anchors and chains ranging, cleaning, marking and calibration, hull and sea chest anodes renewal, sea and overboard valves overhauling, P/V valves overhauling and repairs, rudder pintle bush renewal, steering gear repairs, propeller polishing, tail shaft and rudder measurements;


  • Blasting & Painting Works:
  1. External hull treatment: washing by HPFW 24,130 m², surface preparation by sweeping and gritblasting to SA1/SA2 grades ~44% of external hull area, washing entire area by LPFW after first T/U, application of T/U coats and F/C as per specification;
  2. ICCP system anodes dielectric shield reconditioning by removal of existing insulation and application of new epoxy filler – 18 m²;


  • Steel Works:
  1. Reconditioning of cable lifter and 22 closed chocks by welding build-up and grinding;
  2. Shell plating renewal ~1.5 tons, rudder blade steel works ~1.5 tons;
  3. Various soft steel works: supports, foundations, handrails, fan casings repairs;
  4. Pipe Works: various Engine Room and Main Deck pipe works ~120 r.m., Pump Room pipes reconditioning by welding build-up;


  • Mechanical and Electrical Works:
  1. Main Engine calibration (all bearings) by feeler gauge, piston unit overhauling – 1 unit, cylinder heads overhauling – 6 pcs, fuel pumps – 6 pcs, cargo pump, boilers mountings, lifeboats, accommodation ladders testing, windlasses and mooring winches overhauling;
  2. Fans electric motors overhauling – 8 pcs, Main and Emergency Switchboards survey – total 20 panels, circuit breakers – 4 pcs.

 

General

Type Crude Oil Tanker
Status finished
LOA 277.32
B 53
DWT 160,044
Customer center
> News and events
On 12th of November 2024, after completion of her commercial obligations and having finalized the ...
22.11.2024
In line with the company’s motto, SANTIERUL NAVAL CONSTANTA SA (CONSTANTA SHIPYARD), in close ...
14.11.2024
We are proud to announce that on Thursday, October 3, 2024, the naming ceremony of the ship M/T ...
04.10.2024

Warning: Unknown: open(/var/lib/php5/sess_c3bec90d3d10e3d58f2c1376b91eb267, O_RDWR) failed: No space left on device (28) in Unknown on line 0

Warning: Unknown: Failed to write session data (files). Please verify that the current setting of session.save_path is correct (/var/lib/php5) in Unknown on line 0