The ship arrived in mid April 2019 in Constanta Shipyard, in order to perform several repair works and specific docking works. The main works being the following:
• Regular dry dock works: anchor chains cleaning, sea chest cleaning, sea valves overhauling, rudder clearances measurements, tailshaft wear down, anodes renewal;
• External hull treatment: total area 17.000 sqm (HPFW washing, grit blasting SA1 + SA2, silicone paint application underwater area and bootop); Propeller silicone paint application
• Retrofit installation of water Ballast Treatment System – Headway
• Various electrical and mechanical works: ME overhauling (7 lines), pumps overhauling (16 pcs.); electric motors overhauling; load test of lifeboats and davits;
Finally, the ship left the Shipyard, upon completion of repairs according to the contractual terms, to the full satisfaction of her Owners.
Type | Crude Oil Tanker |
Status | finished |
LOA | 243 m |
B | 42.02 m |
DWT | 109,060 |